| Schuh works on installing new brick on the corner of Walnut and Washington Street. |
 |
| New brick at the new entrance. |
 |
| The terrazzo was refinished in the seating area of the coffee shop. The rest of the floor will be wood. |
 |
| The Old Castle guys installed the glass in the interior corridor. |
 |
| This is the new interior corridor. The view from the elevators. It's gettin there! |
 |
| The restaurant is taking shape. Schuh is getting all the drywall up around the kitchen. |
 |
| The epoxy guys get the space ready to put in the floor for behind the bar in the coffee shop. |
 |
| Applying the epoxy floor. |
 |
| The terrazzo in the bar is getting refinished. |
 |
| The terrazzo guy is sealing the floor. |
 |
| The HVAC equipment is on this newly constructed mezzanine. Soon there will be another level leading up to the restaurant for emergency use for now. |
 |
| The kitchen in the restaurant is getting ready for it's epoxy floor. |
 |
| The coffee shop is getting closer to being done! |